日本一区午夜艳熟免费,久久久久有精品国产麻豆,久久精品国产99精品国产亚洲性色,中国国语毛片免费观看视频

How to properly install swing particles?
Rock particles machine installation instructions
  The rock particles machines for the entire packing, unpacking after moved to the appropriate use of local, pad level to use.
  Electrical circuit means is not subject to the restriction of the rotational direction, the line is clamped by the base below to switching, the cable card via the belt cover.
  1.1 before installing the first reference to the packing list check parts are complete and damage the rock particles.
  1.2 installation, refer to the installation diagram which rock particles machine supporting chassis must be mounted horizontally on the foundation, the foundation should have sufficient stiffness and strength to support the the vibrating screen dynamic load and static load.
  1.3 can take advantage of the screen box trunnion lifting screening machine, lifting the entire sieve can not be directly linked to the exciter.
  Should ensure that a class of non-moving parts of the screen box and hopper, chute kept to a minimum 75mm gap between 1.4 installed swing particles machine screen machine.
  1.5 swing the particle machine equipment installed, maintained around the screen surface level, otherwise, you can adjust the spring seat support pad thin sheet iron.
  1.6 springs must be in a vertical state, the spring fixation in the sieve box of the trunnion.
  1.7 the vibration sieve drive direction given is standing on the feed side, face the direction of the flow of material, observed the motor position, the left-hand side to the left to the driver, the right-hand side for the right to drive. The vibrating screen with symmetrical design, both sides pulley. Replace the motor position to change the direction of the left and right drive.
  1.8 to ensure that the tension of the V-belt has a sufficient amount of adjustment the two pulley end surface adjustment in a plane.
  The 1.9 swing particles machine before the trial must be by hand (or other) rotating exciter. Flexible rotation, the jamming before starting rock particles.
  No-load commissioning, should be less than 2 hours after the end of the installation and adjustment of 1.10 rock particles, smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ° C.
  Rock particles machine instructions
  1. Use: starting rock particles, the mixture was poured into a hopper, and by the the rotating drum swing, squeezing the material through a screen to form particles, such as crushed pieces, should be added gradually, not fill, in order to avoid pressure is too large the screen wearing. 2. Note: Hopper as powder stop high, must not spent shovel, avoid hand injury accident, application of bamboo shovel or parking.
  Rock particles machine maintenance instructions
  1. Periodically check the parts, once a month, check the worm gear, worm gear, bearing and active part of the flexible and wear, discovered defects should be repaired in time, shall not be reluctant to use.
  2. Rock particles machine should be placed on a clean dry indoor atmosphere acids and its parts shall not contain corrosive gases flowing places.
  3. The rock particles machine after use or lockout, wash or brush cleared bucket remaining powder will remove the rotating drum, and then properly installed and ready to work for the next.
  4. Disable a longer time, must be rock particles systemic wipe clean parts of the glossy coated with anti-rust oil with a cloth booth
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

2021国产精品视频网站| 亚洲国产成人一区二区精品区 | 欧美a级毛欧美1级a大片| 欧美日韩视频无码一区二区三| 香蕉久久av一区二区三区| 亚洲成av人片香蕉片| 伊人久久大香线蕉av一区| 国产xxxxx在线观看| 小妖精又紧又湿高潮h视频69| 五月激激激综合网色播| 久久精品亚洲中文字幕无码网站| 国产精品无码一区二区桃花视频| 可以免费观看的av毛片下载| 国产亚洲精品久久久ai换| 四虎影视成人永久免费观看视频| 毛茸茸厕所偷窥xxxx| 黄色a级国产免费大片| 人禽杂交18禁网站免费| 亚洲一区二区三区av天堂| 日本黄页网站免费观看| av无码一区二区三区| 亚洲精品白浆高清久久久久久| 国产精品免费看久久久| √8天堂资源地址中文在线| 女人张开腿让男桶喷水高潮 | 中文字幕av一区中文字幕天堂| 久久人人爽爽爽人久久久| 少妇被粗大猛进进出出s小说| 蜜桃av噜噜一区二区三区| 久久精品夜夜夜夜夜久久| 久久亚洲私人国产精品va| 最新国产毛2卡3卡4卡| 少妇被粗大的猛进69视频| 日韩va中文字幕无码电影| 男女猛烈激情xx00免费视频| 蜜桃臀无码内射一区二区三区| 国产亚洲真人做受在线观看| 国产精品无码av无码| 香蕉久久一区二区不卡无毒影院| 亚洲精品日韩一区二区电影| 成熟丰满熟妇av无码区|